Client: Hartsfield-Jackson Atlanta International Airport
Market: Airport Infrastructure
Areas of Expertise: Concrete Pavement, Foundations, Earthwork and Taxiway
Duration: 15 months
Total Value: US$20,000,001 - $30,000,000
Contract Date:10/7/2003
.
Precision 2000, Inc. worked in joint venture on this project, which involved the construction of various items of work as the first phase of the construction of the East International Terminal at Atlanta’s airport. Earth fill embankments were placed for an extension of taxiway “L” and “M”, along with interim drainage and erosion control systems to stabilize the area. Relocation of very deep major storm drainage and sanitary sewer systems was also done in this project. Another significant area of work consisted of constructing a protective structural concrete slab over the existing Flint River Enclosure. The six-foot thickslab is supported by a deep foundation consisting of drilled caissons ranging from 50-foot to 130-foot deep.
|